|
BP Plaza - Central Plant

| Project: |
BP Plaza – Central Plant (Bank of America)
333 South Hope St.
Los Angeles, Ca 90071 |
| Description: |
Install Andover Continuum controls energy management
system on a 1440 kW cogeneration plant and employ a sophisticated
control scheme for two 200-ton absorption chillers and two 1800-ton
centrifugal chillers. Due to the nature of a new central plant in
downtown Los Angeles, custom plume abatement control was also integrated
into the cooling tower/condenser water system. |
| Value: |
$700,000 |
| Duration |
1 year |
|
|